The ceiling tiles are going in and the overhead lighting fixtures are in. The wood trim has been stained and installation will start this week. The interior doors are being installed today. In the kitchen the commercial dishwasher, clothes washer, and dryer are here. The ranges and refrigerators are scheduled for the 30th. On the 26th the tables and chairs will arrive. Outside the forms are being set for the last of the concrete work. Once the slabs for the outside units are poured the heating and air-conditioning contractor can complete his work.