Final Touches
The exterior trim, soffit, and rain gutters are being installed on the drive through. The wood that covers the steel beams that extend out from the main structure (the large white panel in the photo) as well as the drive through ceiling and the underside of the brick arches will be covered in white EFIS. This is a stucco-like material, which will match the other white trim on the outside of the building. All exterior work should be complete by the end of next week.
Inside the grid for the drop ceiling is being installed.
Subscribe to:
Post Comments (Atom)
2 comments:
Luke,
Thanks for consistently posting the pictures. It makes me very homesick, but I am so glad to see the building being finished. I just wish I were there in person. Can't wait to see the finished product!!
Karen Schouweiler & family
Karen,
This is Cindy. Soooohhhhhh good to hear from you. We miss you, too. I miss you at NG, as well.
Take care, and God bless.
Cindy
Post a Comment